Skip to content

Manufacturing

Manufacturing capability

This page is about what the manufacturer can do, not about a building. It covers the published assembly processes, the customisation envelope, and what happens between an enquiry and a shipped mass-production order.

Capability

What the manufacturer publishes about its own operation

A short list, because it is the whole published list. Floor area, headcount, equipment schedules and capacity figures are not published, so they are not claimed here.

  • In-house R&D team with multiple patents
  • Modern production workshops and equipment
  • Quality management system applied to every order
  • OEM / ODM and full custom sizing
  • HF welding, sewing/tape and bonding processes

Reference lead times

Published reference figures, subject to confirmation by the manufacturer against your specification:

Sampling
7–15 days (reference)
Mass production
15–30 days (reference)
Length range
5 cm to 100 m

MOQ: Depends on specification and material — confirmed per project

Where the R&D sits

Dongtai YILON Industrial Co., Ltd. is a National High-Tech Enterprise founded in 2014, with an in-house R&D team and multiple technical patents. Process and material decisions are made in-house rather than outsourced.

About YILON

Assembly

Three processes, matched to the host material

The zipper is only half the seal — the other half is how it is joined to your product. The published routes are high-frequency welding, sewing followed by seam taping, and adhesive bonding.

Published assembly processes
ProcessUsed onNotes
HF welding, sewing/tape, bonding#10 resin, #5 resin, circular airtight zipperFull combination available on the resin and circular ranges
HF welding, tape, bondingSelf-healing airtight zipperSewing is not listed for this product
HF welding, sewingPEVA airtight zipper, high-speed roller door zipperSimpler two-process route
HF welding, bondingDrysuit envelope zipperSuited to silicone rubber

Why high-frequency welding matters

  • Welding fuses the zipper tape to the host material instead of perforating it, so the seal is not interrupted by stitch holes.
  • It suits TPU and PVC panels — the materials used on dry bags, inflatables and protective coverings.
  • Where the host material cannot be welded, sewing followed by seam taping is the published alternative.

Airtight TPU builds are published with a 60 kPa sealing strength (#10 resin and circular) and a 3,000+ open/close cycle figure.

Read the process guide

The full manufacturing guide covers construction, the welding route and the sealing performance published across the range.

TPU airtight zipper manufacturing process

Enquiry to production

Three stages, no surprises

A custom airtight zipper order succeeds or fails on the parameters agreed up front. These are the three stages, with the published reference lead times.

  1. Enquiry

    Confirmed at enquiry

    Send the application, the effective opening length, the size or tape width, the host material and the target waterproof rating. Oil resistance requirements, test conditions and acceptance criteria are agreed at this point rather than discovered later.

    • Use case and application
    • Length range and effective opening length
    • Size or tape width, colour, opening style and slider count
    • Host material to be joined, and target rating (IPX6 / IPX7 / IPX8)
    • Sample, trial production and mass production quantities
  2. Sampling

    7–15 days (reference)

    A sample is produced to the agreed drawing. The sample is what gets tested — installed into your host material rather than tested loose — because the finished assembly is what has to pass, not the zipper on its own.

    • Model, colour, length, opening style, slider and end structure
    • Dimensions and tolerances measured against the agreed drawing
    • Open/close cycle testing against the published 3,000+ figure
    • Airtight or watertight testing at the agreed rating and conditions
    • Assembly testing with your own material, then packaging and batch identification
  3. Mass production

    15–30 days (reference)

    Once the sample and acceptance criteria are signed off, production runs to the agreed specification. Batch identification and traceability are set before scale-up so the delivered goods can be traced back to the agreed sample.

    • Lead time confirmed against specification, material and quantity
    • Sampling method and acceptance criteria agreed
    • Batch identification and traceability
    • Test reports for the agreed rating supplied with the order

The procurement checklist guide sets out the same three stages as a checklist you can work through with your own engineering team. Read the procurement checklist

Customisation

Produced to your specification, not picked off a shelf

Length is produced from 5 cm to 100 m to order. Everything below is confirmed against your drawing at enquiry.

  • Size and tape width
  • Length and effective opening
  • Colour
  • Slider type and count
  • Opening style
  • Material and coating
  • Waterproof rating and oil resistance
  • Test requirements

What is deliberately not on this page

A reader evaluating a supplier often wants floor space, machine counts, staff numbers and monthly capacity. None of that is published by the manufacturer, so none of it is stated here. Rather than fill the gap with an estimate, this page stays with what can be traced to the published material: the capability set, the assembly processes, the customisation envelope and the reference lead times.

If a specific figure matters for your supplier audit, ask for it directly — it will be answered against your project rather than published as a general claim.